The primary park features a potential of 200 MW whilst Sandrini II features a capability of one hundred MW. The full cost of both of those assignments weren't disclosed having said that, during development, about 200 staff were being used. The projects are envisioned to discover a handful of positions https://solarpanelsberkeley.blogspot.com/