Penmann recently finalised a significant HVAC upgrade at Nutricia’s Liverpool-based production site, providing a bespoke ventilation and climate control system built to comply with demanding hygiene and production standards. The project encompassed the end-to-end implementation of advanced HVAC systems across civil, Medium Care (MC) and High Care (HC) areas. Based https://socialrator.com/story11891198/penmann-delivers-specialist-hvac-installation-for-nutricia-s-liverpool-site-in-line-with-fsi-phase-1-and-2